Code of Federal Regulations
>
30 CFR Mineral Resources
>
II Department of the Interior, B...
>
250 Oil And Gas And Sulphur Oper...
Login required to View Regulations
Sign In
or
Register Now
. Registration is fast and free!
Subpart E —
Oil and Gas Well-Completion Operations
§250.500 —
General requirements
§250.501 —
Definition
§250.502 —
[Reserved]
§250.503 —
Emergency shutdown system
§250.504 —
Hydrogen sulfide
§250.505 —
Subsea completions
§§250.507-250.508
§250.509 —
Well-completion structures on fixed platforms
§250.510 —
Diesel engine air intakes
§250.511 —
Traveling-block safety device
§250.512 —
Field well-completion rules
§250.513 —
Approval and reporting of well-completion operations
§250.514 —
Well-control fluids, equipment, and operations
§250.515 —
[Reserved]
§250.516 —
[Reserved]
§250.517 —
[Reserved]
§250.518 —
Tubing and wellhead equipment
§250.519 —
What are the requirements for casing pressure management?
§250.520 —
How often do I have to monitor for casing pressure?
§250.521 —
When do I have to perform a casing diagnostic test?
§250.522 —
How do I manage the thermal effects caused by initial production on a newly completed or recompleted well?
§250.523 —
When do I have to repeat casing diagnostic testing?
§250.524 —
How long do I keep records of casing pressure and diagnostic tests?
§250.525 —
When am I required to take action from my casing diagnostic test?
§250.526 —
What do I submit if my casing diagnostic test requires action?
§250.527 —
What must I include in my notification of corrective action?
§250.528 —
What must I include in my casing pressure request?
§250.529 —
What are the terms of my casing pressure request?
§250.530 —
What if my casing pressure request is denied?
§250.531 —
When does my casing pressure request approval become invalid?