Login required to View Regulations

Sign In or Register Now.  Registration is fast and free!

 
§1206.468 — How do I determine washing allowances if I have an arm's-length washing contract or no written arm's-length contract?
 
(a)
If you or your affiliate incur(s) washing costs under an arm's-length washing contract, you may claim a washing allowance for the reasonable, actual costs incurred.
 
(b)
You must be able to demonstrate that your or your affiliate's contract is arm's-length.
 
(c)
If you have no written contract for the arm's-length washing of coal, and neither you nor your affiliate perform your own washing, you must propose to ONRR a method to determine the washing allowance using the procedures in §1206.458(a).
 
(1)
You must use that method to determine your allowance until ONRR issues a determination.
 
(2)
[Reserved]

   Reason: