Login required to View Regulations

Sign In or Register Now.  Registration is fast and free!

 
§250.723 — What additional safety measures must I take when I conduct operations on a platform that has producing wells or has other hydrocarbon flow?

You must take the following safety measures when you conduct operations with a rig unit or lift boat on or jacked-up over a platform with producing wells or that has other hydrocarbon flow:

 
(a)
The movement of rig units and related equipment on and off a platform or from well to well on the same platform, including rigging up and rigging down, must be conducted in a safe manner;
 
(b)
You must install an emergency shutdown station for the production system near the rig operator's console;
 
(c)
You must shut-in all producible wells located in the affected wellbay below the surface and at the wellhead when:
 
(1)
You move a rig unit or related equipment on and off a platform. This includes rigging up and rigging down activities within 500 feet of the affected platform;
 
(2)
You move or skid a rig unit between wells on a platform; or
 
(3)
A MODU or lift boat moves within 500 feet of a platform. You may resume production once the MODU or lift boat is in place, secured, and ready to begin operations.
 
(d)
All wells in the same well-bay which are capable of producing hydrocarbons must be shut-in below the surface with a pump-through-type tubing plug and at the surface with a closed master valve prior to moving rig units and related equipment, unless otherwise approved by the District Manager.
 
(1)
A closed surface-controlled subsurface safety valve of the pump-through-type may be used in lieu of the pump-through-type tubing plug provided that the surface control has been locked out of operation.
 
(2)
The well to which a rig unit or related equipment is to be moved must be equipped with a back-pressure valve prior to removing the tree and installing and testing the BOP system.
 
(3)
The well from which a rig unit or related equipment is to be moved must be equipped with a back pressure valve prior to removing the BOP system and installing the production tree.
 
(e)
Coiled tubing units, snubbing units, or wireline units may be moved onto and off of a platform without shutting in wells.

   Reason: