Code of Federal Regulations
>
30 CFR Mineral Resources
>
V Ocean Energy Management...
>
B Offshore
>
585 Renewable Energy And ...
Login required to View Regulations
Sign In
or
Register Now
. Registration is fast and free!
Subpart G —
Facility Design, Fabrication, and Installation
§585.700 —
What reports must I submit to BOEM before installing facilities described in my approved SAP, COP, or GAP?
§585.701 —
What must I include in my Facility Design Report?
§585.702 —
What must I include in my Fabrication and Installation Report?
§585.703 —
What reports must I submit for project modifications and repairs?
§585.704 —
[Reserved]
§585.705 —
When must I use a Certified Verification Agent (CVA)?
§585.706 —
How do I nominate a CVA for BOEM approval?
§585.707 —
What are the CVA's primary duties for facility design review?
§585.708 —
What are the CVA's or project engineer's primary duties for fabrication and installation review?
§585.709 —
When conducting onsite fabrication inspections, what must the CVA or project engineer verify?
§585.710 —
When conducting onsite installation inspections, what must the CVA or project engineer do?
§585.711 —
[Reserved]
§585.712 —
What are the CVA's or project engineer's reporting requirements?
§585.713 —
What must I do after the CVA or project engineer confirms conformance with the Fabrication and Installation Report on my commercial lease?
§585.714 —
What records relating to SAPs, COPs, and GAPs must I keep?