Login required to View Regulations

Sign In or Register Now.  Registration is fast and free!

 
§585.301 — What do ROW grants and RUE grants include?
 
(a)
An ROW grant:
 
(1)
Includes the full length of the corridor on which a cable, pipeline, or associated facility is located;
 
(2)
Is 200 feet (61 meters) in width, centered on the cable or pipeline, unless safety and environmental factors during construction and maintenance of the associated cable or pipeline require a greater width; and
 
(3)
For the associated facility, is limited to the area reasonably necessary for a power or pumping station or other accessory facility.
 
(b)
An RUE grant includes the site on which a facility or other structure is located and the areal extent of anchors, chains, and other equipment associated with a facility or other structure. The specific boundaries of an RUE will be determined by BOEM on a case-by-case basis and set forth in each RUE grant.

   Reason: