Login required to View Regulations

Sign In or Register Now.  Registration is fast and free!

 
§75.519-1 — Main power circuits; disconnecting switches; locations

Section 75.519 requires

 
(a)
that a disconnecting switch be installed on the surface at a point within 500 feet of the place where the main power circuit enters the underground area of a mine, and
 
(b)
that, in an instance on which a main power circuit enters the underground area through a shaft or borehole, a disconnecting switch be installed underground within 500 feet of the bottom of the shaft or borehole.

   Reason: