§194.115 — Response resources
 
(a)
Each operator shall identify and ensure, by contract or other approved means, the resources necessary to remove, to the maximum extent practicable, a worst case discharge and to mitigate or prevent a substantial threat of a worst case discharge.
 
(b)
An operator shall identify in the response plan the response resources which are available to respond within the time specified, after discovery of a worst case discharge, or to mitigate the substantial threat of such a discharge, as follows:
Tier 1Tier 2Tier 3
High volume area6 hrs30 hrs54 hrs.
All other areas12 hrs36 hrs60 hrs.